Maintenance Units

Maintenance Units

Operation without restrictions thanks to the many possible combinations

The inspection procedure of bridge pylons and bridge arches presents particular problems for access technology. When combined with the appropriate maintenance units for pylons or arches, these areas also do not present any problems for the WEMO-tec under bridge access platform.

Combine the under bridge access platforms with diverse accessories:

  • Maintenance Units can be used to reach inspection and work sites on bridge pylons to a height of up to 100.00 m.
  • The newly developed pylon platform walkway with a length of up to 6.00 m is particularly well suited for work on wide bridge pylons.
  • The pylon platform walkway takes larger work teams without any problem.
  • To be able to view every square centimetre of a bridge arch, using the 12 m wide Maintenance Units for arches, this is dropped down to a depth of up to 100 m.

Contact

WEMO-tec GmbH Eichenzell
Bürgermeister-Ebert Str. 17
36124 Eichenzell
Tel.: +49 6659 86-201
Fax: +49 6659 86-299
E-Mail: bu-geraete@wemo-tec.com

 

WEMO-tec GmbH Augsburg
Winterbruckenweg 27
86316 Friedberg-Derching
Tel.: +49 82 33 73 53 957

Mobil: +49 151 / 26 40 58 46
E-Mail: manfred.biefel@wemo-tec.com